Project Case Studies

A SNAPSHOT OF OUR WORK

  • primary image of BERKUT PLATFORM - ARKUTAN DAGI TOPSIDES DEVELOPMENT

    BERKUT PLATFORM - ARKUTAN DAGI TOPSIDES DEVELOPMENT

    As part of the development of the Arkutan Dagi field at Sakhalin-1, an offshore, ice-resistant fixed platform was deployed which went on to become the largest oil and gas production platform in Russia. This gravity-based structure has been…

    Read more

  • primary image of SAKHALIN 1 MAJOR TURNAROUND 2016

    SAKHALIN 1 MAJOR TURNAROUND 2016

    Exxon Neftegas Limited (ENL) successfully conducted a major maintenance and modification shutdown on Sakhalin 1 project during August 2016, for which Kentech Sakhalin (KSTS) were given various scopes to complete across three of the affected…

    Read more

  • primary image of ODOPTU STAGE 2 (OS2)

    ODOPTU STAGE 2 (OS2)

    Odoptu Stage 2 (OS2) comprises a further development of the Odoptu First Stage Production (FSP) on Sakhalin Island, in Russia’s Far East. The Odoptu North Well Site (NWS), First Stage Production Facility (FSP) is part of the Sakhalin-1 field…

    Read more

  • primary image of SAKHALIN-1 GENERAL MAINTENANCE CONTRACT

    SAKHALIN-1 GENERAL MAINTENANCE CONTRACT

    In August 2015, Kentech were awarded the long term contract on the Sakhalin-1 Project by Exxon Neftegas Limited, for the execution and management of maintenance and modification services associated with general electrical, instrumentation,…

    Read more

  • primary image of SAKHALIN-1 OVERVIEW

    SAKHALIN-1 OVERVIEW

    The Sakhalin-1 Project is an oil and gas development on the northeast shelf of Sakhalin Island. The project area includes the Chayvo, Odoptu and Arkutun-Dagi fields. Total recoverable reserves are estimated to be 2.3 billion barrels of oil…

    Read more

  • primary image of SAKHALIN-2 OVERVIEW

    SAKHALIN-2 OVERVIEW

    The Sakhalin 2 project was the first PSA to be signed in Russia and represents one of the largest single foreign investments into Russia. The project involves two fields, the Piltun-Astokhskoye, primarily an oil field with associated gas, and…

    Read more

  • primary image of ODOPTU FIRST STAGE PRODUCTION FACILITY

    ODOPTU FIRST STAGE PRODUCTION FACILITY

    Kentech Sakhalin were responsible for the complete electrical and instrumentation works on the Odoptu First Stage Production Facility and modifications to the Chayvo Process Facility, 90km from the Odoptu Facility. The scope of work consisted…

    Read more

  • primary image of BOOSTER STATION 2 PROJECT, SAKHALIN-2

    BOOSTER STATION 2 PROJECT, SAKHALIN-2

    As part of the Sakhalin-2 project, SEIC constructed a Gas Compression and Oil Pumping Station.  The overall facility, called Booster Station 2 (BS2), is located approximately 250km north of Yukhno-Sakhalinsk and 1.2km to the north of the…

    Read more

  • primary image of CHAYVO-ODOPTU PIPELINE CAMP FACILITY

    CHAYVO-ODOPTU PIPELINE CAMP FACILITY

    Kentech Sakhalin were awarded the engineering, procurement and construction of a 308 man camp to be located on the 79km long pipeline running between the Chayvo and Odoptu settlements in the very north of Sakhalin Island.  Kentech's work…

    Read more

  • primary image of SAKHALIN 2 LNG / OET PROJECT

    SAKHALIN 2 LNG / OET PROJECT

    The Japanese firm Chiyoda, in a joint venture (CTSD) with Toyo Engineering and a Russian consortium, was awarded the Sakhalin 2 LNG (Liquified Natural Gas) and OET (Oil Export Terminal) Project.  The project delivers the World’s…

    Read more

  • primary image of LNG STORAGE TANKS PROJECT, SAKHALIN-2

    LNG STORAGE TANKS PROJECT, SAKHALIN-2

    Kentech were commissioned by CB&I to undertake the full electrical and instrumentation installation on the two LNG storage tanks at Sakhalin-2. The two tanks are over 40 metres and 70 metres in diameter and are made of reinforced cast concrete.…

    Read more

  • primary image of SAKHALIN-1 EARLY PRODUCTION FACILITY

    SAKHALIN-1 EARLY PRODUCTION FACILITY

    The Expro Group awarded Kentech the contract for the complete multi-discipline installation of the Early Production Facility as part of the Exxon Sakhalin-1 Field in Russia.  The 50,000 BOPD early stage production facility was required to be…

    Read more

  • primary image of INTERIM PRODUCTION FACILITY, SAKHALIN-1

    INTERIM PRODUCTION FACILITY, SAKHALIN-1

    Kentech was awarded a multi-disciplinary support contract for planning and executing the preservation of the Sakhalin-1 IPF. Kentech was responsible for the construction of the IPF, which was used for early production whilst the main OPF was…