ORYX GTL PROJECT

Key Features

Location:
Ras Laffan, Qatar

Operator:
Oryx GTL (Sasol / Qatar Petroleum)

Duration:
30 months

Client:
Oryx GTL

Scope:
Electrical, instrumentation and HVAC

ORYX GTL PROJECT

The contract involved a long term service agreement covering:-

  • Servicing and calibration of instrument control valves
  • Repair and overhaul of electrical motors
  • Maintenance and repair of transformers
  • Maintenance and repair of HV/MV circuit breakers
  • Maintenance support for air conditioning services
  • Small power and lighting
  • Calibration of instrument test equipment
  • Electrical and instrumentation maintenance support services

Works were carried out on site and at dedicated workshops in Doha Industrial Area.  The Oryx GTL (Gas to Liquids) plant is the world's first commercial GTL production facility and shall produce 34,000 barrels per day. GTL takes natural gas and converts it to low-sulphur, environmentally friendly diesel, naphtha and LPG.

Kentech's ability to take single point responsibility for the complete scope was a major determinant in Oryx GTL's selection process.

Ras Laffan Industrial City is the heart of Qatar's gas upstream and downstream production and this project award was an important milestone in Kentech's growth in Qatar and the Gulf region in general.  