CENTRAL DEGASSING STATION, ASAB

Key Features

Location:
Abu Dhabi, UAE

Operator:
Abu Dhabi Company for Onshore Oil Operations (ADCO)

Duration:
14 months

Client:
Tekfen Construction & Installation Co. Inc.

Scope:
Electrical Installation Works

CENTRAL DEGASSING STATION, ASAB

The Central Degassing Station project is part of the SAS Oilfield Development for the Abu Dhabi Company for Onshore Oil Operations (ADCO). The rejuvenation of the Asab field is central to ADCO’s overall development plan to increase its production and achieve the committed production targets.

Petrofac were awarded the overall contract in 2009 at a value of $2.3 billion. Tekfen Construction & Installation Co. Inc. were brought in by Petrofac as main contractor on the CDS project and subsequently awarded Kentech a contract  for the electrical installation works.

The primary activity of this contract is the installation, termination and glanding of 3.6 million metres of cabling. The sheer volume of work within a tight timescale gave the team challenging weekly cable laying targets. From the outset however Kentech were able to set and meet weekly target figures, a feat which was also achieved during the harsh summer temperatures and through the reduced summer working hour regulations in the UAE. With our peak team of over 250 cable pullers, the team reached an incredible 114,000 metres of cable pulled in just one week - a company record for Kentech.

The project took place over a 14 month period and represents our first collaboration with Tekfen, although Kentech has been heavily involved with the Asab Field Development since 2007.

Currently, Kentech is also providing oilfield services to Petrofac and National Contracting Company.