CCR PLATFORMING, CANGREJERA, MEXICO

Key Features

Location:
Cangrejera Petrochemical Complex, Coatzacoalcos, Mexico

Operator:
PEMEX

Client:
Consorcio CCR Platforming Cangrejera (Dragados, ACS, Sener, GTC)

Duration:
36 months

Scope:
Civil and Electrical Works

CCR PLATFORMING, CANGREJERA, MEXICO

Kentech Mexico entered into a contract with Dragados Industrial for the Main Civil Foundation Works associated with their US$ 250 Million CCR Platforming (Aromatics Plant).

This project was Kentech’s first entry into Heavy Civil Works and comprised the excavation, compaction, installation of reinforced steel and concrete pouring for the 8 key foundation structures.

Initially contracted for this scope of works only, as a result of the quality of service provided, Kentech were continually awarded additional scopes of works including completion of the main substation building, execution of pipe rack structures and foundations, underground duct banks etc., with the final contract scope being some 4 times greater than that originally contacted and a total of 900,000 manhours executed on these contract works without a lost time incident being recorded.

In addition to the above, Kentech were awarded the Electrical Installation Works associated with the project.  The scope of works includes MV and LV switchgear and transformers, cable tray, conduit and MV and LC cabling installations.

Kentech’s total manhour expenditure on this project to date exceeds 1 million manhours without an LTI.  