CLEAN FUELS PROJECT - CCR RELOCATION

Key Features

Location:
Mina Al Ahmadi Refinery, Kuwait

Operator:
KNPC

Client:
FDHJV (Fluor/Daewoo/HHI JV)

Duration:
April 2015 - March 2016

Scope:
Electrical & Instrumentation Installation & Testing

CLEAN FUELS PROJECT - CCR RELOCATION

Kentech Kuwait was awarded the CCR Relocation project in March 2015 by Fluor, Daewoo and Hyundai JV (FDH JV). The project required a live change over during the ongoing processes of KNPC.  All operating groups were required to be relocated to alternate buildings without any disruption to production. The most critical activity was the relocation of Operating Group 10 (OG10) which monitors and controls the critical operation requirements of KNPC and other stakeholders including Equate. Kentech entered into a number of sub-contracts with key Original Equipment Manufacturers (OEM’s) including Allen Bradley, Gaitronics, Emerson and SAAB for this specific OG10 relocation.

All the live relocation and changeovers were completed without any failures and recommissioned successfully within the scheduled one day window.  This has been the first such relocation activity of its kind at KNPC and has been a huge success without any loss in production.  

Although the co-ordination of the OEM’s proved challenging with resources provided from various countries, the professional execution and relocation of the 1st Operating Group has enhanced  the confidence of all stakeholders in  Kentech’s capability to deliver projects successfully. 

The current CCR will be refurbished and upgraded in future in alignment with latest technology and systems. 

Following successful commissioning of the CCR relocation works, Kentech have been awarded additional works for LCR-6 Annex Building Cable Testing & Change Over which involves shutdowns, loop checks and function checks activities.  The team were also subsequently awarded a significant contract to execute the complete E&I package on CFP Area 2.